This project involved the construction of the new International Convention Centre and all of the supporting services.

This project had an extra layer of complexity due to the complications stemming from the large fire mid construction, resulting in a full re-build.

The services we provided to this project included:

  • Post fire temporary ventilation system commissioning

  • Airside commissioning of pressurised temporary ‘safe’ areas for post fire de-construction

  • Staged airside commissioning of basement carpark systems

  • Staged flushing of mechanical pipework systems

  • Enabling works for Horizon Hotel opening

  • Waterside commissioning

  • Integration of NZICC and Horizon Hotel